Explanation
A non-conformity can turn up anywhere: a product that does not meet the specification, an employee who does not follow a procedure, an expired inspection, a missing document or a finding from an audit. It is a gap between what should be and what is.
You record the non-conformity and first take an immediate measure (the correction) to limit the damage. Then you investigate the cause and assess whether a corrective action is needed so it does not come back. Many schemes grade non-conformities by severity; the terms differ per scheme, so use the classification of your certifier.
Non-conformities are not shameful but valuable information. An organisation without any often is not looking closely. An incident is about safety, damage or environment, a non-conformity about not meeting a requirement. In practice the two overlap and many organisations record them in the same system.
Example from practice
During goods receipt it turns out that part of the delivery has a different size than ordered. The non-conformity is recorded, the batch blocked, the supplier contacted and the cause investigated.
© 2026 BrydgeOne. General information, not legal or other professional advice. No rights can be derived from this explanation.
